A mid-sized furniture manufacturer replaced Excel-based planning with a platform integrated into NAV/Business Central — and gained measurable savings in transport and production tracking.
The client ran NAV/Business Central with the manufacturing module, but delivery planning lived in Excel: routes built by hand, truck loading estimated by eye, transport costs rising year over year. Production progress was invisible — bottlenecks surfaced days later.
A manufacturing platform integrated with NAV/Business Central over a service bus (RabbitMQ): optimised truck packing, delivery planning tools, real-time scanning of the start and end of every operation, and Power BI reports on a governed semantic model. That same architecture is the PROEE100 product today.
Real-time production tracking replaced manual record-keeping, and packing algorithms raised space utilisation on deliveries. More than 200 hours of manual work saved per month.
We start with a discovery workshop: 1–2 weeks, fixed price, and a scope and estimate document at the end — yours whether or not we go further.
Request a workshop